- A completed Building Permit application on the prescribed form,
- Conservation Authority Permit if applicable,
- Schedule 1 completed by designer,
- EEDS (Energy Efficiency Design Summary) prepared and signed by designer,
- Site Plan in accordance in Section 14 Building By-law,
- Architectural Drawings prepared by a qualified BCIN (Building Code Identification Number) Designer, and
- Architectural Drawings for a dwelling shall include:
(a) Foundation / basement plan with all structural elements shown and sized as per the Building Code,
(b) Main floor / second floor plan with all structural elements shown and sized as per the Building Code,
(c) Sections throughout pertinent parts of the building to show how the building is being constructed with building components labelled,
(d) Elevations of each side of the building,
(e) Engineering for elements including any elements that fall outside of Part 9 of the OBC (LVL beams, beams carrying point loads, ridge beams, etc.),
- Roof truss layout. (Roof trusses sealed by engineer if available at time of application. If not, they must be submitted as soon as they are received),
- On-site Sewage System Permit, and
- HVAC design prepared by a qualified BCIN designer. HVAC plan shall include:
(a) Heat Loss / gain calculations,
(b) Duct Layout- in colour to clearly identify cold and warm air plenums, and
(c) HRV layout.
(d) If the heat source is an in-floor loop layout system, a “Loop Layout Plan” prepared by a BCIN qualified designer shall be provided along with an HRV design.